Project Description
Door of Hope Church
Built in 1909, the leaders of Door of Hope Church started renovating the structure. Part of the reconstruction was a complete overhaul of their HVAC system. The Heat Pump Store removed its inefficient, old oil furnace and replaced it with a 38-ton VRV (Variable Refrigerant Flow) system. The system included 28 units to heat and cool classrooms, meeting spaces, offices and a large sanctuary.